Mechanical & Electrical Engineering

機電工程

High-end hotels

  • Sheraton Tung Chung Hotel, Hong Kong
    (2017 - 2019)
  • MGM MACAU
    (2014 - 2016)
  • Studio City Macau
    (2012 - 2015)
  • Wynn Macao
    (2004 - 2005)

Public-private housing

  • Design and construction of Light Public Housing at Kai Tak, Shum Wan Road
    (2023 - Ongoing)
  • Construction of Public Housing Development at North West Kowloon Reclamation Site 1(East)
    (2023 - Project in progress)
  • Aberdeen Island South Shore III
    (2021 - 2023)
  • Residential Development at No. 1 to 11, Au Pui Wan Street, Fo Tan
    (2019 - 2022)
  • Public Rental Housing Development at Tuen Mun Area 54 Sites 1&1A
    (2019 - 2021)
  • Residential on Lot 500, Kwun Chui Road, Tuen Mun
    (2018 - 2020)
  • URA Sham Shui Po NKIL6506
    (2017 - 2020)
  • Lai Chi Shan Residential Project, 8 Shan Tong Road, Tai Po (Diamond Cab)
    (2017 - 2020)
  • Fo Tan Chun Yeung Estate Public Housing Development
    (2016 - 2019)
  • Residential development at Shek Kok Road, Tseung Kwan O, Site B, Area 85, TKOTL No. 111
    (2013 - 2015)

Hospital Programs

  • Chinese Medicine Hospital and Government Chinese Medicines Testing Institute in Tseung Kwan O
    (2021 - Ongoing)
  • Superstructure and Associated Work Contract For Redevelopment of Kwong Wah Hospital (Phase 1)
    (2018 - 2021)
  • Chinese University of Hong Kong Hospital
    (2016 - 2019)
  • Centre of Excellence in Paediatrics in Kai Tak Development
    (2013 - 2016)
  • The Construction of Superstructure of Block B for St. Paul’s Hospital Redevelopment at Causeway Bay, Hong Kong
    (2012-2015)

Public Buildings

  • Batch 1A Development for Hong Kong-Shenzhen Innovation and Technology Park
    (2023 - Project in progress)
  • Design and construction of Kong Nga Po Police Training Facilities
    (2022 - Project in progress)
  • The Development of Hostel and Academic Building Complex at 30 Renfrew Road, Kowloon Tong for Hong Kong Baptist University
    (2021-2024)

Landmarking

  • New Central Harbourfront, Site 3, Hong Kong
    (2024–Ongoing)
  • Hong Kong Palace Museum
    (2019-2021)
  • Sky Bridge connection Terminal 1 and North Satellite Concours
    (2018-2020)
  • Tseung Kwan O Fire Training School
    (2012-2015)
  • Hong Kong Disneyland Fantasy land
    (2003-2005)

Capital projects

  • New Territories West Landfill Expansion
    (2024–Ongoing)
  • Relocation of Sha Tin Sewage Treatment Works to Cavern – Ancillary Buildings, Cavern Ventilation System and Associated Works
    (2023–Ongoing)
  • HKIA (Airport) North Commercial District Enabling and Option Fit-out Works for APM Depot
    (2016-2019)
  • Hong Kong – Zhuhai – Macao Bridge Contract HY/2011/03 – Hong Kong Link Road Section Between Scenic Hill and Hong Kong Boundary Crossing Facilities
    (2012-2016)

Epidemic prevention projects

  • Kai Tak Temporary Quarantine Center
    (2022-2022)
  • Design and construction of the Hong Kong Infection Control Center at North Lantau Hospital
    (2020-2021)
  • Temporary Quarantine Center at Penny's Bay 1B
    (2020-2020)

Sustainable Development Works

X

Sheraton Tung Chung Hotel, Hong Kong
(2017 - 2019)

  • Project

    Sheraton Tung Chung Hotel, Hong Kong
    (2017 - 2019)

    Client

    Shimao Property Holdings Limited

    Construction Period

    2017 - 2019

  • Scope of Works

      CSME provides electrical, air-conditioning and fire-fighting systems for two 13-storey and 15-storey high-class hotels and four-storey podiums and basements respectively.

....More

MGM MACAU
(2014 - 2016)

  • Project

    MGM MACAU
    (2014 - 2016)

    Client

    MGM Grand Paradise Ltd

    Construction Period

    2014 - 2016

  • Scope of Works

      The scope of the project comprises the construction of a casino resort with a total gross floor area of approximately 391,750 square meters (4.22 million square feet), which includes hotel buildings, casinos, entertainment venues, retail space and parking. CSME supplied and installed electrical and mechanical systems and equipment, focusing on: water supply and drainage / electrical systems / high voltage (HV) electrical installations / low voltage (LV) electrical installations / ventilation and air-conditioning (MVAC) systems / fire protection (water system) / fire protection (monitoring system) / centralized monitoring and control system, etc.

....More

Studio City Macau
(2012 - 2015)

  • Project

    Studio City Macau
    (2012 - 2015)

    Client

    Melco International Development Limited

    Construction Period

    2012 - 2015

  • Scope of Works

      Studio City Macau (“Stargate”) offers 1,660 deluxe suites and is an integrated resort with theaters, entertainment, retail and gaming. CSME mainly provides and installs electrical, air-conditioning, fire-fighting, water supply and drainage works for the 84-storey hotel.

....More

Wynn Macao
(2004 - 2005)

  • Project

    Wynn Macao
    (2004 - 2005)

    Client

    Wynn Resorts (Macau) S.A.

    Construction Period

    2004 - 2005

  • Scope of Works

       CSME supplies and installs electrical systems for projects, including high voltage equipment, backup generators and low voltage switchgear.

....More

Design and construction of Light Public Housing at Kai Tak, Shum Wan Road
(2023 - Ongoing)

  • Project

    Design and construction of Light Public Housing at Kai Tak, Shum Wan Road
    (2023 - Ongoing)

    Client

    Architectural Services Department

    Construction Period

    2023 - Ongoing

  • Scope of Works

      The project involves the construction of 7 blocks of 16-storey low-rise public rental housing (10,723 flats) at Sai Wan Road, Kai Tak using the modular construction method. CSME  for the project to provide air-conditioning, electricity, ultra-low voltage, fire-fighting and plumbing supply and installation.

....More

Construction of Public Housing Development at North West Kowloon Reclamation Site 1(East)
(2023 - Project in progress)

  • Project

    Construction of Public Housing Development at North West Kowloon Reclamation Site 1(East)
    (2023 - Project in progress)

    Client

    Hong Kong Housing Authority

    Construction Period

    2023 - Project in progress

  • Scope of Works

      The project comprises three 39 to 40-storey residential towers with a total of 2,475 flats, two 3-storey shopping and social welfare facilities, and a 10-storey HD office building (with data center on 8/F and 9/F). CSME supplied, installed and commissioned the central air-conditioning and mechanical ventilation systems for the 10-storey HD office building and the data center. The air-conditioning system comprises 5 sets of chiller plants, 5 sets of cooling towers, 228 fan coils, 10 fan cabinets and 14 data center computer air-conditioners.

....More

Aberdeen Island South Shore III
(2021 - 2023)

  • Project

    Aberdeen Island South Shore III
    (2021 - 2023)

    Client

    Cheung Kong Holdings

    Construction Period

    2021 - 2023

  • Scope of Works

      The project consists of 4 blocks of 29-storey to 31-storey residential buildings, together with a 5-storey podium including carparks, external gardens and a clubhouse, providing a total of 1,200 residential units. CSME for the supply and installation of electrical, ventilation and air-conditioning, building automation systems.

....More

Residential Development at No. 1 to 11, Au Pui Wan Street, Fo Tan
(2019 - 2022)

  • Project

    Residential Development at No. 1 to 11, Au Pui Wan Street, Fo Tan
    (2019 - 2022)

    Client

    Centralcon Investment Holding Company Limited

    Construction Period

    2019 - 2022

  • Scope of Works

      The project consists of four 40 to 41-storey residential towers (1,335 units) with a 4-storey podium with retail, clubhouse, swimming pool, kindergarten, car park and transportation interchange. CSME supplied and installed the electrical, ultra-low voltage engineering and air-conditioning and ventilation systems for the project.

....More

Public Rental Housing Development at Tuen Mun Area 54 Sites 1&1A
(2019 - 2021)

  • Project

    Public Rental Housing Development at Tuen Mun Area 54 Sites 1&1A
    (2019 - 2021)

    Client

    Hong Kong Housing Authority

    Construction Period

    2019 - 202

  • Scope of Works

      CSME supplies and installs electrical and ultra-low voltage electrical systems for four 37- to 39-story public housing buildings, as well as retail, kindergarten, and semi-subterranean parking lots.

....More

Residential on Lot 500, Kwun Chui Road, Tuen Mun
(2018 - 2020)

  • Project

    Residential on Lot 500, Kwun Chui Road, Tuen Mun
    (2018 - 2020)

    Client

    Fortune Choice Development Limited (Evergrande Group)

    Construction Period

    2018 - 2020

  • Scope of Works

      The project comprises 4 blocks of 20-storey residential buildings, together with 22 individual houses and a clubhouse, providing a total of 1,947 residential units. CSME supplied and installed the electrical and ultra-low voltage electrical systems for the project.

....More

URA Sham Shui Po NKIL6506
(2017 - 2020)

  • Project

    URA Sham Shui Po NKIL6506
    (2017 - 2020)

    Client

    Cheung Kong Holdings

    Construction Period

    2017 - 2020

  • Scope of Works

      The project covers 3 sites (Site A, B & C) and involves the construction of 4 blocks of 29-storey to 36-storey residential buildings with podiums, providing a total of 877 residential units. CSME supplied and installed the electrical and ultra-low voltage electrical systems for the project.

....More

Lai Chi Shan Residential Project, 8 Shan Tong Road, Tai Po (Diamond Cab)
(2017 - 2020)

  • Project

    Lai Chi Shan Residential Project, 8 Shan Tong Road, Tai Po (Diamond Cab)
    (2017 - 2020)

    Client

    China Overseas Development Limited

    Construction Period

    2017 - 2020

  • Scope of Works

      The project consists of 17 residential towers of 10 to 19 storeys with clubhouse and carpark. CSME Company supplied and installed electrical, extra low voltage electrical, ventilation and splitter equipment for the project.

....More

Fo Tan Chun Yeung Estate Public Housing Development
(2016 - 2019)

  • Project

    Fo Tan Chun Yeung Estate Public Housing Development
    (2016 - 2019)

    Client

    Hong Kong Housing Authority

    Construction Period

    2016 - 2019

  • Scope of Works

      CSME supplies and installs electrical and ULV electrical systems for 5 blocks of 34 to 39-storey public housing as well as retail and car parks.

....More

Residential development at Shek Kok Road, Tseung Kwan O, Site B, Area 85, TKOTL No. 111
(2013 - 2015)

  • Project

    Residential development at Shek Kok Road, Tseung Kwan O, Site B, Area 85, TKOTL No. 111
    (2013 - 2015)

    Client

    Cheung Kong Holdings

    Construction Period

    2013 - 2015

  • Scope of Works

      The total gross floor area of the project is approximately 81,500 square meters. It consists of three residential towers, Towers 1 and 2 are 36-storey and Towers 3 are 37-storey, together with a three-storey carpark and clubhouse, providing a total of 872 residential units. CSME is responsible for the supply and installation of electrical, ultra-low voltage electrical, ventilation and split units.

....More

Chinese Medicine Hospital and Government Chinese Medicines Testing Institute in Tseung Kwan O
(2021 - Ongoing)

  • Project

    Chinese Medicine Hospital and Government Chinese Medicines Testing Institute in Tseung Kwan O
    (2021 - Ongoing)

    Client

    Architectural Services Department

    Construction Period

    2021 - Ongoing

  • Scope of Works

      The project has an area of about 60,056 square meters, including the design and construction of:

    1. a 9-storey Chinese medicine hospital building (400 beds) with a 1-storey basement garage, including wards, outpatient clinics, pharmacy and research facilities, mainly providing allied health services, diagnostic and ambulatory services and community health services; 2. a 5-storey Chinese medicine testing center, including laboratories, a medicinal botanical garden and a collaboration and training centre; 3. a 5-storey Chinese medicine testing center, including laboratories, a medicinal botanical garden and a collaboration and training center.
    2. a 5-storey Chinese Medicine Testing Center, including laboratories, a medicinal botanical garden and a collaboration and training center, mainly for scientific research and testing purposes.
    3. CSME provided the supply and installation of E&M and related systems for the project.

....More

Superstructure and Associated Work Contract For Redevelopment of Kwong Wah Hospital (Phase 1)
(2018 - 2021)

  • Project

    Superstructure and Associated Work Contract For Redevelopment of Kwong Wah Hospital (Phase 1)
    (2018 - 2021)

    Client

    Hospital Authority

    Construction Period

    2018 - 2021

  • Scope of Works

      The project comprises a two-storey basement and a 19-storey superstructure with a site area of approximately 8,202 sq.m. and a gross floor area of approximately 146,000 sq.m. The project is expected to be completed by the end of 2012. CSME provided electrical and air-conditioning system installation for the project.

....More

Chinese University of Hong Kong Hospital
(2016 - 2019)

  • Project

    Chinese University of Hong Kong Hospital
    (2016 - 2019)

    Client

    The Chinese University of Hong Kong

    Construction Period

    2016 - 2019

  • Scope of Works

      The project is a 14-storey medical center, including clinics, operating theatres, wards, teaching rooms and other functions. CSME provided integrated E&M equipment for the project.

....More

Centre of Excellence in Paediatrics in Kai Tak Development
(2013 - 2016)

  • Project

    Centre of Excellence in Paediatrics in Kai Tak Development
    (2013 - 2016)

    Client

    Architectural Services Department

    Construction Period

    2013 - 2016

  • Scope of Works

      The project is for the design and construction of two separate 12-story buildings (Block A and Block B) connected by a bridge with a central courtyard and a 2-story basement for parking and other uses. Block A provides clinical services such as an integrated rehabilitation center, primarily operating rooms, laboratories, data center, and education and training facilities; Block B provides patient-related facilities and will include a variety of child-friendly design and support facilities as well as clinical facilities. CSME designed and constructed the air-conditioning and laboratory central exhaust systems, low voltage distribution system and ultra low voltage system, fire protection facilities, gas and hot water facilities in the project.

....More

The Construction of Superstructure of Block B for St. Paul’s Hospital Redevelopment at Causeway Bay, Hong Kong
(2012-2015)

  • Project

    The Construction of Superstructure of Block B for St. Paul’s Hospital Redevelopment at Causeway Bay, Hong Kong
    (2012-2015)

    Client

    St. Paul's Hospital

    Construction Period

    2012-2015

  • Scope of Works

      CSME provide electrical and air-conditioning system installation for projects. Serves wards, general operating rooms and other clinical service areas.

....More

Batch 1A Development for Hong Kong-Shenzhen Innovation and Technology Park
(2023 - Project in progress)

  • Project

    Batch 1A Development for Hong Kong-Shenzhen Innovation and Technology Park
    (2023 - Project in progress)

    Client

    Hong Kong Science & Technology Parks Corporation

    Construction Period

    2023 - Project in progress

  • Scope of Works

      The project consists of three main buildings, Blocks 8 and 9 are 7-storey laboratory buildings with two basement floors. Block 11 is a 6-storey innovation lab building (using MIC Assembly Component Construction Method). CSME supplied and installed the air-conditioning and ventilation system, building management system, electrical system, fire fighting system and plumbing system for the project.

....More

Design and construction of Kong Nga Po Police Training Facilities
(2022 - Project in progress)

  • Project

    Design and construction of Kong Nga Po Police Training Facilities
    (2022 - Project in progress)

    Client

    Architectural Services Department

    Construction Period

    2022 - Project in progress

  • Scope of Works

      The Kong Nga Po Police Training Facility covers an area of 19 hectares, including Advanced Tactical Driving Training Ground, Major Traffic Accident Training Ground, Virtual Reality Traffic Accident Training System and Modernized Target Practice Range. CSME used two types of prefabricated insulated pipes, HDPE-PIP and GI-PIP, of which HDPE-PIP was the first time to be applied in Hong Kong site. The project team successfully explored the design, construction and acceptance of HDPE-PIP suitable for Hong Kong site, and combined BIM technology with MiMEP technology to prefabricate a variety of MiMEP products such as valve manifolds and hose manifolds in the factory. In addition, we have realized zero welding in the plant room, accelerated the on-site construction progress, and effectively saved the construction cost.

....More

The Development of Hostel and Academic Building Complex at 30 Renfrew Road, Kowloon Tong for Hong Kong Baptist University
(2021-2024)

  • Project

    The Development of Hostel and Academic Building Complex at 30 Renfrew Road, Kowloon Tong for Hong Kong Baptist University
    (2021-2024)

    Client

    Baptist University

    Construction Period

    2021-2024

  • Scope of Works

      The project has a total gross floor area of 56,284 square meters and a site area of 7,500 square meters. The main contract works include the construction of four 13 to 15-storey student hostels (with a total of 1,103 hostel rooms), a teaching complex and a footbridge connecting the four buildings, with part of the basement to the second floor comprising recital rooms, instrument practice rooms and classrooms, etc., and part of the second floor and the floors above the second floor comprising dormitory rooms and Part of 2F and floors above 2F are dormitory rooms and multi-purpose rooms. CSME will provide E&M and related system installation for the project.

....More

New Central Harbourfront, Site 3, Hong Kong
(2024–Ongoing)

  • Project

    New Central Harbourfront, Site 3, Hong Kong
    (2024–Ongoing)

    Client

    Pacific Gate Development Limited (parent company: Henderson Land Development Company Limited)

    Construction Period

    2024–Ongoing

  • Scope of Works

      The New Central Harbourfront 3 site is a core commercial mixed-use development in Hong Kong, which is a key location in Central and is committed to creating a world-class waterfront landmark and all-weather leisure and lifestyle facilities. CSME is responsible for the supply and installation of air-conditioning, electrical and mechanical systems in the project.

....More

Hong Kong Palace Museum
(2019-2021)

  • Project

    Hong Kong Palace Museum
    (2019-2021)

    Client

    West Kowloon Cultural District

    Construction Period

    2019-2021

  • Scope of Works

      The museum consists of a 7,600-square-meter exhibition hall. Other facilities include a 400-seat lecture hall, as well as function rooms, restaurants and stores. CSME supplied and installed electrical, ultra-low voltage, air-conditioning and ventilation systems for the project.

....More

Sky Bridge connection Terminal 1 and North Satellite Concours
(2018-2020)

  • Project

    Sky Bridge connection Terminal 1 and North Satellite Concours
    (2018-2020)

    Client

    Hong Kong International Airport

    Construction Period

    2018-2020

  • Scope of Works

      The Sky Bridge,which connects Terminal 1 and the North Satellite Concourse, is 200 meters long, 20 meters wide and 28 meters above ground level, allowing the A380, currently the largest passenger aircraft, to pass underneath the bridge.CSME is responsible for the supply and installation of air-conditioning, electrical, fire-fighting and water supply and drainage systems for the project.

....More

Tseung Kwan O Fire Training School
(2012-2015)

  • Project

    Tseung Kwan O Fire Training School
    (2012-2015)

    Client

    Architectural Services Department

    Construction Period

    2012-2015

  • Scope of Works

      CSME provided E&M works for 19 fire-fighting simulation models and 10 4-6 storey dormitories, academic buildings and exteriors. Including: air-conditioning, ventilation, electrical and gas systems.

....More

Hong Kong Disneyland Fantasy land
(2003-2005)

  • Project

    Hong Kong Disneyland Fantasy land
    (2003-2005)

    Client

    Hong Kong International Theme Parks Limited

    Construction Period

    2003-2005

  • Scope of Works

      CSME supplies electrical systems for park ride/sound/show control systems, restaurants and kitchens; general lighting systems and programmable dimming systems for the realization of specific display lighting scenes and effects; and supplies and installs electrical equipment including cable bridges/troughs, conduit laying, and interfacing coordination for audio systems, park equipment, rides, show control systems, and other related systems.

....More

New Territories West Landfill Expansion
(2024–Ongoing)

  • Project

    New Territories West Landfill Expansion
    (2024–Ongoing)

    Client

    Environmental Protection Department

    Construction Period

    2024–Ongoing

  • Scope of Works

      CSME is providing E&M installation works for air-conditioning, electrical, ultra-low voltage, fire fighting and plumbing works for a factory complex of 2 office buildings, 2 leachate and biogas treatment plants, 1 communication center, 1 equipment MCC plant room and 1 replacement kiosk for the project.

....More

Relocation of Sha Tin Sewage Treatment Works to Cavern – Ancillary Buildings, Cavern Ventilation System and Associated Works
(2023–Ongoing)

  • Project

    Relocation of Sha Tin Sewage Treatment Works to Cavern – Ancillary Buildings, Cavern Ventilation System and Associated Works
    (2023–Ongoing)

    Client

    Drainage Services Department

    Construction Period

    2023–Ongoing

  • Scope of Works

      Relocation of Sha Tin Sewage Treatment Works to Caverns Relocating the Sha Tin Sewage Treatment Works to caverns will free up about 28 hectares of land at the existing site for housing and other uses beneficial to the people's livelihood, and will bring long-term benefits to the community and the environment in Sha Tin. The project includes the construction of two ventilation buildings and other associated building components.

      CSME is responsible for the construction of the associated systems including: 

      • Cavern Ventilation System 
      • Power Supply
      • Central Monitoring and Control System
....More

HKIA (Airport) North Commercial District Enabling and Option Fit-out Works for APM Depot
(2016-2019)

  • Project

    HKIA (Airport) North Commercial District Enabling and Option Fit-out Works for APM Depot
    (2016-2019)

    Client

    Airport Authority

    Construction Period

    2016-2019

  • Scope of Works

      CSME provided installation services for the E&M system of the project, such as electrical installation, ventilation and air-conditioning installation, weak electrical equipment, elevators, drainage system, connection to the airport system signal, etc. The first stage was the leveling of the golf course, with a few underground cables and electrical equipment dismantled and moved. 

      The first phase was the leveling of the golf course, the dismantling and relocation of the underground cable electrical equipment, and a small amount of E&M and signaling equipment in the neighboring building, Skypier. 

      In the second phase, all electrical and mechanical equipment will be provided in the newly constructed three-story underground building, the unmanned train depot and engine room.

....More

Hong Kong – Zhuhai – Macao Bridge Contract HY/2011/03 – Hong Kong Link Road Section Between Scenic Hill and Hong Kong Boundary Crossing Facilities
(2012-2016)

  • Project

    Hong Kong – Zhuhai – Macao Bridge Contract HY/2011/03 – Hong Kong Link Road Section Between Scenic Hill and Hong Kong Boundary Crossing Facilities
    (2012-2016)

    Client

    Highways Department

    Construction Period

    2012-2016

  • Scope of Works

      CSME provides E&M equipment for the following areas:

      • 1.2km two-lane tunnel 
      • 0.6km one-lane tunnel 
      • 1.6km two-lane highway
      • Other buildings, administration building, petrol filling station, pumping station and ventilation building, etc. Other buildings, administration building, oil station, water pump house, ventilation building, etc.

      Including 11kV to 380V electrical installation, ventilation and air-conditioning installation, tunnel ventilation, tunnel lighting, fire-fighting, water hoses, etc.

....More

Kai Tak Temporary Quarantine Center
(2022-2022)

  • Project

    Kai Tak Temporary Quarantine Center
    (2022-2022)

    Client

    Architectural Services Department

    Construction Period

    2022-2022

  • Scope of Works

      CSME supplied and installed electrical, air-conditioning, fire-fighting and plumbing systems for 3,500 MiC units in the Kai Tak Emergency Quarantine Center.

....More

Design and construction of the Hong Kong Infection Control Center at North Lantau Hospital
(2020-2021)

  • Project

    Design and construction of the Hong Kong Infection Control Center at North Lantau Hospital
    (2020-2021)

    Client

    Hong Kong International Airport

    Construction Period

    2020-2021

  • Scope of Works

      The Hong Kong Infection Control Center at NLH, with a construction area of approximately 450,000 square feet, will provide 136 negative pressure rooms, more than 800 beds, and ancillary medical facilities, commencing construction in September 2020 for a January 20, 2021 completion date. The total construction period is only 122 days. This is the first smart hospital in Hong Kong to adopt Modularized Integrated Construction (MiC) for negative pressure isolation wards. CSME provided installation of electrical, air-conditioning, fire-fighting and EMI systems for the project.

....More

Temporary Quarantine Center at Penny's Bay 1B
(2020-2020)

  • Project

    Temporary Quarantine Center at Penny's Bay 1B
    (2020-2020)

    Client

    Architectural Services Department

    Construction Period

    2020-2020

  • Scope of Works

      CSME supplied and installed electrical, air-conditioning, fire-fighting and plumbing systems for 6,500 MiC units at the Penny's Bay Emergency Quarantine Center.

....More