Foundation Engineering

基礎工程

Foundation Engineering

  • Foundation for Public Housing Development at Long Bin Phase 2, Yuen Long
    (2025-Work in progress)
  • Foundation for Public Housing Development at Yuen Long South Site 2.2
    (2025-Work in progress)
  • Oyster Bay Station and Associated Works Sub-contract for Bored Pile Works
    (2024-Work in progress)
  • Foundation for Public Housing Development at Tung Chung Area 46
    (2024-Work in progress)
  • Design and Construction of Light Public Housing at Olympic Acenue, Kai Tak Domestic Sub-Contract for Supply and Installation of Bored Piling Works
    (2024-2024)
  • Foundation,Site Formation, Roads and Drainage for Public Housing Development at Chung Nga Road West, Tai Po
    (2023-Work in progress)
  • Foundation for Public Housing Development at Kam Sheung Road Site 1 Phases 1&2
    (2023-2024)
  • Foundation Works for the TKO1 Phase 1 Greenfield Data Center Development in Hong Kong
    (2023-2024)
  • Foundation and Site Formation for Public Housing Development at Ka Wai Man Road Phase 1
    (2022-Work in progress)
  • Foundation for Public Housing Development at Kwu Tung Area 19 Phase
    (2022-2023)
  • Foundation for Public Housing Development at Tung Chung Area 109
    (2021-2023)
  • Foundation for Public Housing Development at Yip Wong Road Phase 1 and Phase 2, Tuen Mun
    (2020-2021)

設計及建造

醫院

院校建設

酒店及商場

辦公大樓﹑廠房及物流中心

私人屋苑

公營房屋

X

Foundation for Public Housing Development at Long Bin Phase 2, Yuen Long
(2025-Work in progress)

  • Project

    Foundation for Public Housing Development at Long Bin Phase 2, Yuen Long
    (2025-Work in progress)

    Client

    Hong Kong Housing Authority

    Construction Period

    2025-Work in progress

  • Scope of Works
      • Scope of works includes 191 large-diameter bored piles with pile caps, averaging 96m in depth (maximum 130m). The complex geological conditions present significant construction challenges.
      • The site's proximity to residential areas necessitates strict adherence to noise and vibration control measures within a tight construction schedule.
      • Upon completion, the project will provide 5,172 public rental housing units.
....More

Foundation for Public Housing Development at Yuen Long South Site 2.2
(2025-Work in progress)

  • Project

    Foundation for Public Housing Development at Yuen Long South Site 2.2
    (2025-Work in progress)

    Client

    Hong Kong Housing Authority

    Construction Period

    2025-Work in progress

  • Scope of Works
      • Scope of works includes 172 large-diameter bored piles with pile caps.
      • The site contains karst caves with complex geological conditions.
      • Upon completion, the project will provide 5,000 public housing units.
....More

Oyster Bay Station and Associated Works Sub-contract for Bored Pile Works
(2024-Work in progress)

  • Project

    Oyster Bay Station and Associated Works Sub-contract for Bored Pile Works
    (2024-Work in progress)

    Client

    MTR

    Construction Period

    2024-Work in progress

  • Scope of Works
      • The project involves foundation construction for MTR Oyster Bay Station, primarily comprising 526 large-diameter bored piles.
      • Due to the site's proximity to operational railway tracks, stringent restrictions apply to material transport and construction activities.
      • The piling works involve multiple pile diameters and diverse structural reinforcement cage configurations.
....More

Foundation for Public Housing Development at Tung Chung Area 46
(2024-Work in progress)

  • Project

    Foundation for Public Housing Development at Tung Chung Area 46
    (2024-Work in progress)

    Client

    Hong Kong Housing Authority

    Construction Period

    2024-Work in progress

  • Scope of Works
      • The project was awarded as the third-ranked tenderer based on outstanding Contract scoring performance.
      • Construction of foundations for 2 buildings, comprising:47 large-diameter bored piles with pile caps,537 sheet piles for structural support.
....More

Design and Construction of Light Public Housing at Olympic Acenue, Kai Tak Domestic Sub-Contract for Supply and Installation of Bored Piling Works
(2024-2024)

  • Project

    Design and Construction of Light Public Housing at Olympic Acenue, Kai Tak Domestic Sub-Contract for Supply and Installation of Bored Piling Works
    (2024-2024)

    Client

    Hong Kong Architectural Services Department

    Construction Period

    2024-2024

  • Scope of Works
      • Construction of foundations for 7 Light Public Housing blocks, comprising 121 large-diameter bored piles and 600 Driven H-piles.
      • The project site is adjacent to residential buildings, transport hubs, and educational institutions, necessitating stringent construction requirements.
      • Subsurface obstructions include existing buried structures and extensive rock strata, contributing to geologically complex ground conditions.
      • Upon completion, the project will deliver 10,723 Light Public Housing units
....More

Foundation,Site Formation, Roads and Drainage for Public Housing Development at Chung Nga Road West, Tai Po
(2023-Work in progress)

  • Project

    Foundation,Site Formation, Roads and Drainage for Public Housing Development at Chung Nga Road West, Tai Po
    (2023-Work in progress)

    Client

    Hong Kong Housing Authority

    Construction Period

    2023-Work in progress

  • Scope of Works
      • The project was awarded as the second-ranked tenderer based on outstanding Contract scores.
      • The project is located west of Chung Nga Road, Tai Po, adjacent to communities, hospitals, etc., with complex stakeholder relations in the surrounding area.
      • The site is a non-typical foundation project involving multiple engineering disciplines, with a height difference exceeding 20 meters and limited available workable area.
....More

Foundation for Public Housing Development at Kam Sheung Road Site 1 Phases 1&2
(2023-2024)

  • Project

    Foundation for Public Housing Development at Kam Sheung Road Site 1 Phases 1&2
    (2023-2024)

    Client

    Hong Kong Housing Authority

    Construction Period

    2023-2024

  • Scope of Works
      • The project is located near Kam Sheung Road MTR Station, adjacent to the MTR rail line.
      • Construction involved the foundation works for nine residential blocks, including 140 large-diameter bored piles and pile caps, under a tight project schedule.
      • This public housing development will provide 3,743 residential units and associated facilities, with an anticipated completion date in 2027.
      • The project was completed three days ahead of schedule and received a commendation letter from the Housing Authority.
....More

Foundation Works for the TKO1 Phase 1 Greenfield Data Center Development in Hong Kong
(2023-2024)

  • Project

    Foundation Works for the TKO1 Phase 1 Greenfield Data Center Development in Hong Kong
    (2023-2024)

    Client

    China Telecom Global Limited

    Construction Period

    2023-2024

  • Scope of Works
      • The project is situated on a seawall within a reclamation area, adjacent to Linde HKO and the Global Switch Data Centre, requiring stringent control over settlement and vibration.
      • The primary scope comprises 453 pre-drilled socketed steel H-piles and associated pile caps.
      • The project was successfully completed, earning a letter of appreciation from the client, and contributed to the company's successful bid for the superstructure works.
....More

Foundation and Site Formation for Public Housing Development at Ka Wai Man Road Phase 1
(2022-Work in progress)

  • Project

    Foundation and Site Formation for Public Housing Development at Ka Wai Man Road Phase 1
    (2022-Work in progress)

    Client

    Hong Kong Housing Authority

    Construction Period

    2022-Work in progress

  • Scope of Works
      • Construction scope includes piles, ELS, pile caps/foundations, drainage systems, slope works, temporary diversion of engineered vehicle access (EVA), and site formation works.
      • The site features complex surroundings with multiple vibration/settlement/noise-sensitive structures. Located on a hillside with significant elevation changes, the site has compact working space.
      • As the first Housing Department foundation project utilizing robotic arm welding technology, it was featured in a government news release. 
....More

Foundation for Public Housing Development at Kwu Tung Area 19 Phase
(2022-2023)

  • Project

    Foundation for Public Housing Development at Kwu Tung Area 19 Phase
    (2022-2023)

    Client

    Hong Kong Housing Authority

    Construction Period

    2022-2023

  • Scope of Works
      • Construction of foundations for 6 buildings and a car park, including 106 large-diameter bored piles, 250 pre-drilled steel H-piles, contaminated mud treatment, and pile cap works.
      • The company's first foundation project deployed in the Northern Metropolis area.
      • The project was completed 4 days ahead of schedule and received the Housing Department New Works Contract - Outstanding Contractor Award - Application of Building Information Modelling (BIM) Technology in Construction Stage (Main Contractor) - Certificate of Merit.
....More

Foundation for Public Housing Development at Tung Chung Area 109
(2021-2023)

  • Project

    Foundation for Public Housing Development at Tung Chung Area 109
    (2021-2023)

    Client

    Hong Kong Housing Authority

    Construction Period

    2021-2023

  • Scope of Works
      • Construction of foundations for 2 buildings and a car park, including 75 large-diameter bored piles and pile cap construction.
      • The project is located in a land reclamation area. Deep Cement Mixing (DCM) ground layers widely exist at depths of 8~30m underground. As the company's first foundation project in a reclamation zone, it accumulated valuable experience for subsequent bidding and construction in similar areas.
      • The project was awarded the Housing Authority Outstanding Contractor Award - Innovate Application of Smart Technologies and the Best Site Safety Award - Full-term Site Safety (Civil/Foundation Works).
....More

Foundation for Public Housing Development at Yip Wong Road Phase 1 and Phase 2, Tuen Mun
(2020-2021)

  • Project

    Foundation for Public Housing Development at Yip Wong Road Phase 1 and Phase 2, Tuen Mun
    (2020-2021)

    Client

    Hong Kong Housing Authority

    Construction Period

    2020-2021

  • Scope of Works
      • The project is situated at the intersection of Yip Wong Road and Tin Hau Road, adjacent to the Tuen Mun River and near industrial buildings. Construction must strive to minimise impact on the surrounding environment.
      • Construction of foundations for four buildings, including:
        91 large-diameter bored piles;153 pre-drilled steel H-piles;Pile cap works.
      • Beyond conventional foundation works, additional scope includes: Contaminated mud treatment; Footpath diversion works
      • The project was completed five days ahead of schedule and was honoured with the Housing Authority Outstanding Foundation Project Award.
....More