New Yongchun Station Building Project of Xingguo-Quanzhou Railway
5.7 million yuan
November 2019
Xiangpu Railway Co., Ltd.

KATSINA University of Transportation in Nigeria
Infinity Nigeria Limited

Ibadan Dry Port Project in Nigeria
Infinity Nigeria Limited

Fujian Sanan Logistics Park

Redevelopment of Kowloon Tsai Swimming Pool Complex
(2020-2024)
Architectural Services Department
2020-2024
The project mainly involves the demolition of the existing swimming pool and reconstruction of a two-storey main building, renovation works at Bauhinia Garden, and public works for the improvement of surrounding streets.

Hong Kong Palace Museum
(2019-2021)
West Kowloon Cultural District Authority
2019-2021

Fire Services Training School Cum Driving Training School at Pak Shing Kok, Area 78, Tseung Kwan O
(2012-2015)
Architectural Services Department
2012-2015

Construction of a Joint-User Complex at Bailey Street, To Kwa Wan Reclamation
(2010-2013)
Architectural Services Department
2010-2013

Sport Centre in Area 28A, Fanling / Sheung Shui
(2008-2011)
Architectural Services Department
2008-2011

Sun Yat Sen Memorial Park and Swimming Pool
(2008-2011)
Architectural Services Department
2008-2011

Construction of ASD Siu Sai Wan Complex
(2008-2010)
ASD
2008-2010
Including a multi-purpose indoor sports arena with 1000 seats, two indoor swimming pools, a library, a table tennis room, a children's game room, two interconnected activity rooms, and a community hall that can accommodate 450 people, this green building provides leisure and recreational sports facilities for residents in the east of Hong Kong Island, promoting community communication while reducing energy consumption.

Sports Ground at Area 45, Tseung Kwan O
(2006-2009)
Architectural Services Department
2006-2009

Centre for Youth Development at Chai Wan, Hong Kong
(2005-2008)
Architectural Services Department
2005-2008

Hin Tin Public Swimming Pool Phase 2
(2005-2007)
Architectural Services Department
2005-2007

Hong Kong Disneyland Resort Fantasyland Attractions at Penny's Bay, Lantau Island
(2003-2005)
Hong Kong Disneyland Management Ltd.
2003-2005

Hong Kong Disneyland Resort - Space Mountain and Buzz Lightyear Attractions in Tomorrowland at Penny's Bay, Lantau Island
(2003-2005)
Hong Kong Disneyland Management Ltd.
2003-2005

Substructure and Superstructure for Hong Kong Movie City
(2003-2004)
Hong Kong Movie City Co., Ltd
2003-2004

New Headquarter for EMSD at Kai Shing Street, Kai Tak, Kowloon
(2002-2004)
Architectural Services Department
2002-2004

Police Headquarters Phase 3 at Arsenal Street, Wan Chai
(2000-2004)
Architectural Services Department
2000-2004

Sports Centre at Pak Shek Kok, Tai Po Area 39, TPTL 170
(1999-2000)
Architectural Services Department
1999-2000

Sheung Shui Slaughterhouse in Area 2B
(1997-2000)
Architectural Services Department
1997-2000

UC H.K. Central Library at Moreton Terrace, Causeway Bay
(1997-1999)
Architectural Services Department
1997-1999

Regional Council Heritage Museum
(1996-1998)
Architectural Services Department
1996-1998

Passenger Terminal Building, Chek Lap Kok International Airport
(1995-1997)
Airport Authority Hong Kong
1995-1997

Police Headquarters Phase 2 at Arsenal Street, Wan Chai
(1993-1995)
Architectural Services Department
1993-1995

DESIGN AND CONSTRUCTION OF RENOVATION WORKS FOR SETTING UP OF THE HEADQUARTERS FOR AN INTERNATIONAL ORGANIZATION
(2024-2025)
Architectural Services Department
2024-2025

Joint Cavern Development at Anderson Road Quarry
(2023-Work in progress)
Civil Engineering and Development Department
2023-Work in progress
This project, the first non-infrastructure-related project in Hong Kong to be constructed within a cavern, will utilize MIC technology to construct two government facilities. It is a Design and Build project. The Anderson Road Quarry Site Joint-Use Cavern Development Project will be implemented in three phases:

Design and construction of light public housing at Olympic avenue,Kai Tak
(2023-Work in progress)
Architectural Services Department
2023-Work in progress
Design and construction of 7 seventeen-storey residential buildings using the steel-structured MiC (Modular Integrated Construction) method, including foundation, external envelope, drainage, and greening works. The project covers a site area of 57,314 square meters with a total gross floor area of 320,547 square meters, providing a total of 10,731 units. Among them, Phase I includes Blocks 3, 6, and 7 with 2,972 units, and Phase II includes Blocks 1, 2, 4, and 5 with 7,759 units.

Design and construction of KONG NGA PO Police Training Facilities
(2022-Work in progress)
Architectural Services Department
2022-Work in progress
Design and construction of:

Design and Construction of Temporary Quarantine Facilities at Penny's Bay, Lantau Island, New Territories
(2020-2020)
Architectural Services Department, Hong Kong Government
2020-2020

Lei Yue Mun Park and Holiday Village Emergency Virus Prevention Observation and Isolation Centre
(2020-2020)
Architectural Services Department, Hong Kong Government
2020-2020

Design and Construction of CUHK Medical Centre at the Chinese University of Hong Kong
(2016 – 2020)
CUHK Medical Centre Ltd.
2016 – 2020

Design and Construction of Centre of Excellence Paediatrics at Kai Tak Development, Hong Kong
(2013-2017)
Hospital Authority
2013-2017

Fire Services Training School Cum Driving Training School at Pak Shing Kok, Area 78, Tseung Kwan O
(2012-2015)
Architectural Services Department
2012-2015

Student Hostels (Site 1) for The Chinese University of Hong Kong
(2010-2013)
Chinese University of Hong Kong
2010-2013

Departmental Quarters for Customs & Excise Department
(2010-2013)
Architectural Services Department
2010-2013

Junior Police Officer's Married Quarters at Area 44 Tuen Mun
(2007-2010)
Architectural Services Department
2007-2010

Renovation of Libraries, Phase 2
(2007-2008)
Architectural Services Department
2007-2008

Hin Tin Public Swimming Pool Phase 2
(2005-2007)
Architectural Services Department
2005-2007

Sheung Shui Slaughterhouse in Area 2B
(1997-2000)
Architectural Services Department
1997-2000

Disciplined Services Married Quarters at Ngau Chi Wan
(1995-1996)
Architectural Services Department
1995-1996

China Overseas Building
(1990-1991)
China Overseas Land & Investment Ltd.
1990-1991

The Development of Hostel and Academic Building Complex at 30 Renfrew Road Kowloon Tong for Hong Kong Baptist University
(2021-2024)
Hong Kong Baptist University
2021-2024

A 30-Classroom Secondary School at Site KT2e, Development at Anderson Road, Kwun Tong
(2019-2021)
Architectural Services Department
2019-2021

The Student Amenity Centre at The Chinese University of Hong Kong
(2011-2012)
Chinese University of Hong Kong
2011-2012

Student Hostels (Site 1) for The Chinese University of Hong Kong
(2010-2013)
Chinese University of Hong Kong
2010-2013

The Hong Kong Polytechnic University - Phase 8 Development
(2010-2013)
The Hong Kong Polytechnic University
2010-2013

New Academic Building (NAB), Institute for Advanced Study (IAS) and Residential Accommodation for the Institute for Advanced Study (IASR) for The Hong Kong University of Science and Technology
(2009-2013)
Hong Kong University of Science and Technology
2009-2013

Shek Mun Campus for School of Continuing Education of The Hong Kong Baptist University at Shatin Town Lot 540, Area 11, Shek Mun, N.T.
(2004-2006)
Hong Kong Baptist University
2004-2006
A Purpose-Designed Building for Centralized Science Laboratories at The Chinese University of Hong Kong
(2004-2006)
Chinese University of Hong Kong
2004-2006

Through-Train Schools at Tseung Kwan O, Area 65 (Evangel College)
(2004-2006)
Through-Train Schools
2004-2006

New Campus Development (Community College) of Lingnan University, Tuen Mun TMTL 376
(2003-2005)
Lingnan University
2003-2005

CUHK Engineering Building Complex Phase II at The Chinese University of Hong Kong
(2002-2003)
Chinese University of Hong Kong
2002-2003

Conversion & Extension to Existing Schools Group 3 under School Improvement Programme Ph. IV Package 1
(2001-2003)
Architectural Services Department
2001-2003

City University of Hong Kong Student Hostels Phase 1
(2000-2003)
City University of Hong Kong
2000-2003

Hong Kong Institute of Biotechnology Complex Phase 1
(1990-1991)
Hong Kong Institute of Biotechnology
1990-1991

The Proposed Development at Inland Lot No.9088,New Central Harbourfront Site 3, Hong Kong
(2024-Work in progress)
Henderson Land Development company Limited
2024-Work in progress

Proposed Development at Gage Stret/ Graham Street, Central I.L. 9065, Hong Kong (H18C)
(2023-Work in progress)
Wing Tai Properties Limited、CSI Properties Limited、Urban Renewal Authority
2023-Work in progress

Studio City Phase 2 - Main Contract Works
(2020-2022)
Studio City Developments
2020-2022

Hopewell Centre II Development Superstructure and Ancillary Works
(2019-2025)
Wetherall Investment Limited
2019-2025

MGM Cotai Project for MGM Grand Paradise
(2014-2018)
MGM Macau
2014-2018

The Emperor Hotel Development at 373 Queen's Road East, Wanchai, Hong Kong
(2014-2018)
Emperor International Holdings Ltd.
2014-2018

Yau Tong Phase 4 Shopping Center
(2009-2012)
Hong Kong Housing Authority
2009-2012

City of Dreams Development
(2006-2009)
Melco Hotel & Resort (Macau) Ltd.
2006-2009

MegaBox at Enterprise Square 5 NKIL 5927 Kowloon Bay
(2005-2007)
MegaBox Development Company Ltd.
2005-2007

Citywalk at TWT 398 Tai Ho Road / Yeung Uk Road, Tsuen Wan
(2004-2007)
Sino Group and Urban Renewal Authority J.V.
2004-2007

Wynn Resorts Macau at Rua Cidada De Sintra, Macau
(2004-2006)
Wynn Resorts (Macau) S.A.
2004-2006

Hong Kong Disneyland Hotel at Penny's Bay, Lantau Island
(2003-2005)
Walt Disney Imagineering Hong Kong
2003-2005

Horizon Suite Hotel Development at STTL 461 Ma On Shan
(2000-2002)
Cheung Kong (Holdings) Ltd.
2000-2002

Metropark Hotel Development at Tung Lo Wan Road
(1999-2001)
China Travel International Investment Hong Kong Limited
1999-2001

Choi Ming Shopping Centre at Tseung Kwan O Area 74 Phase 1
(1999-2001)
Hong Kong Housing Authority
1999-2001

South Pacific Hotel
(1990-1992)
Shanghai Industrial Investment Co., Ltd.
1990-1992

The Proposed Development at Inland Lot No.9088,New Central Harbourfront Site 3, Hong Kong
(2024-Work in progress)
Henderson Land Development company Limited
2024-Work in progress
Two Towers and Two Footbridges:
Tower 1 (North Tower):
Tower 2 (South Tower):
Transportation connection passage:

TKO1 Phase 1 Greenfield Data Center Development in Hong Kong
(2024-Work in progress)
China Telecom Global Ltd.
2024-Work in progress

Proposed Development at Gage Stret/ Graham Street, Central I.L. 9065, Hong Kong (H18C)
(2023-Work in progress)
Wing Tai Properties Limited、CSI Properties Limited、Urban Renewal Authority
2023-Work in progress

Proposed Data Centre Development, No. 2-10, Tai Yuen Street, Kwai Chung, N.T.
(2023-Work in progress)
DS Holdings Limited
2023-Work in progress
A 20-storey superstructure with 2 basement levels (Includes:5 levels of 132kV and 11kV substations、8 mechanical data center floors、7 mechanical and electrical (M&E) plant floors、2 underground parking levels)

Batch 1A Development of Hong Kong - Shenzhen Innovation and Technology Park
(2023-2025)
Hong Kong-Shenzhen Innovation and Technology Park Limited
2023-2025
The project includes two 8-story R&D buildings (Building 8&9), a 2-story deep shared underground parking lot, a six story high concrete building MIC Talent Dormitory Building (Building 11), and a temporary sewage treatment plant.

Logistics Centre Development at Tsing Yi Town Lot No. 181, NT.
(2015-2017)
Kongwell Logistics Limited
2015-2017

Chinachem Central One and Two
(2014-2017)
Chinachem Group
2014-2017

Commercial Development at 38 Wong Chuk Hang (38 Southside)
(2014-2017)
Wisefield Enterprises Ltd.
2014-2017

One Midtown at Hoi Shing Road, TWIL 36, Tsuen Wan
(2010-2012)
Wharf Estates Development Ltd.
2010-2012

One Island South at 2 Heung Yip Road, Wong Chuk Hang
(2008-2011)
Wharf Estates Development Ltd.
2008-2011

Asia Aluminum Industrial City in the New High-Tech Industrial Development Zone, Zhaoqing, Guangdong Province
(2007-2008)
Asia Aluminum Holdings Limited
2007-2008

Commercial Building at 196-206 Queen's Road East
(2006-2007)
Hopewell Group
2006-2007

Asia Airfreight Terminal Expansion
(2004-2007)
Asia Airfreight Terminal Co., Ltd.
2004-2007

Hong Kong Movie City at Tseung Kwan O Area 106, TL67 & 81, Sai Kung, N.T.
(2003-2005)
The Hong Kong Movie City Company Ltd.
2003-2005

Science Park Building 6 at Pak Shek Kok Phase 1c, Sha Tin
(2002-2004)
Architectural Services Department
2002-2004

Skyline Tower Commercial Development at NKIL 5846 12 Kai Shun Road Kowloon Bay
(2002-2003)
Sino Group
2002-2003

Science Park Building 4 at Pak Shek Kok Phase 1b
(2001-2003)
Architectural Services Department
2001-2003

Hoi On Centre at Nos 83-91 Nam On Street, Hong Kong
(1994-1995)
Alfa Million Development Ltd
1994-1995

Union Plaza
(1992-1994)
Longcross Ltd.
1992-1994

Kennedy Town Centre
(1992-1994)
The Bank of East Asia Ltd.
1992-1994

China Overseas Building
(1990-1991)
China Overseas Land & Investment Ltd.
1990-1991

Proposed Composite Building at 16-20 Temple Street, Kowloon
(2025-Work in progress)
HENDERSON LAND DEVELOPMENT COMPANY LIMITED
2025-Work in progress
A 23-storey private residential building will be constructed, comprising a two-storey podium, a 19-storey residential tower, and a two-storey roof mechanical room. The entire 19-storey residential section will be built using Modular Integrated

Proposed Residential & Commercial Property Development at Hung Fook Street/ Ngan Hon Street, KIL NO.11276
(2025-Work in progress)
Kerry Properties Limited、Urban Renewal Authority
2025-Work in progress
The platform comprises 8 storeys, featuring four-storey parking areas , three-storey shopping malls and a single clubhouse.
3 residential buildings, with 21 floors, 22 floors, and 22 floors respectively, totaling 669 units.
Site area: 4,581 square meters,;Building area:86,226 square meters.

Residential Development at 391 Chai Wan Road and Adjoining Government Land Chai Wan Inland Lot No. 178(THE HEADLAND RESIDENCES)
(2023-Work in progress)
SWIRE PROPERTIES, China Motor Bus Company Limited
2023-Work in progress
There are three buildings with a total of 850 units, with ancillary buildings such as a bus station, a two-story podium clubhouse, a two-story underground parking lot, a footbridge, and a public open space.

THE PROPOSED RESIDENTIAL DEVELOPMENTFOR AT TKOTL 7ORP, PHASE 13, LOHAS PARK TSEUNG KWAN O, NEW TERRITORIES
(2023-Work in progress)
DYNAMIC WISH LIMITED
2023-Work in progress

WEST RAIL KAM SHEUNG ROAD STATION PACKAGE ONE PROPERTY DEVELOPMENT AT LOT NO. 1040 IN D.D. NO. 103, YUEN LONG, N.T.
(2022-Work in progress)
GRAND AMPLE LIMITED
2022-Work in progress

PROPOSED RESIDENTIAL RE-DEVELOPMENT AT I.L.9076, 135 TAI HANG ROAD, TAI HANG, HONG KONG
(2021-Work in progress)
CITIC Pacific Limited
2021-Work in progress

Commercial and Residential Accommodation at Wong Chuk Hang Station, Package Three, Aberdeen Inland Lot No. 467, Site C
(2021-2025)
MTR/Queen Investments Limited
2021-2025
The construction scope comprises a 5-storey integrated shopping mall, four residential towers (29-31 storeys), a podium garden, clubhouse, and station roof garden. The project will provide 1,200 residential units and 426 parking spaces, covering a site area of 22,383 square meters with a Construction floor area of 199,183 square meters.

URA Redevelopment project I.L.9064, Peel Street and Gage Street, Central, Hong Kong (URA Project (H18-SiteA))
(2021-2025)
Sino Land Company Limited、Urban Renewal Authority
2021-2025
Wong Chuk Hang Station Package Four Property Development at Aberdeen Inland Lot No. 467, Wong Chuk Hang, Hong Kong
(2021-2024)
MTR,Kerry Properties Limited,Sino Group,SWIRE PROPERTIES
2021-2024
The platform comprises three levels, featuring two-storey parking areas and a single clubhouse.
The development includes two residential towers, each rising to 34 storeys, totaling 800 units.
Site area: 6,039 square meters,;Building area:86,226 square meters.
Proposed Residential Development at NKIL 6603, Kai Tak, Kowloon
(2021-2024)
"China Overseas Land & Inve stment Limited"
2021-2024
Two 25-storey residential buildings, one basement level, two to three-storey podiums and a clubhouse, exterior fences and gardening facilities, etc.

Proposed Residential Development At NKIL No. 6576, Kai Tak Area 4B, Site 1 Jai Tak, Kowloon
(2021 - 2024)
Infinite Sun Limited
2021 - 2024
1-storey Basement, 2-storey Podium, 4 nos. of residential building (Tower1: 33-storey, Tower 2: 32-storey, Tower 3: 34-storey and Tower 5: 5-storey) (total no. of units: 1594)

Proposed Residential at NKIL 6574, Area 4B, Site 3, Kai Tak, Kowloon
(2021-2023)
Voyage Mile Limited
2021-2023

PROPOSED COMPREHENSIVE RESIDENTIAL DEVELOPMENT AT NKIL No. 6549 OFF HING WAH STREET WEST, CHEUNG SHA WAN, KOWLOON.(Site B)
(2020-2023)
Sky Asia Properties Limited Parent Company
2020-2023
Four towers, including two levels of basement parking, a luxurious clubhouse, and penthouse duplexes.

PROPOSED COMPREHENSIVE RESIDENTIAL DEVELOPMENT AT NKIL No. 6549 OFF HING WAH STREET WEST, CHEUNG SHA WAN, KOWLOON.(Site A)
(2020-2023)
Sky Asia Properties Limited Parent Company
2020-2023
Seven towers, including two levels of basement parking, a luxurious clubhouse, indoor and outdoor pools, and penthouse duplexes.
Residential Development at Site B, the Southside, 11 Heung Yip Road, Wong Chuk Hang, Hong Kong, Aberdeen Inland Lot NO.467
(2019-2022)
High Crown Holdings
2019-2022
Construct a 2-storey podium on existing MTR depot. Construct two high - rise residential buildings with 25 floors and 30 floors respectively.
Build a swimming pool and a clubhouse on the podium (P/F), and carry out landscaping works.

Proposed Residential Development at NKIL 6575, Site 4B2, Kai Tak, Kowloon
(2019-2022)
China Overseas Land & Inve stment Limited
2019-2022
Residential Development at NKIL6575 with 2 High Rise Towers(T1, T2) and One Low Rise Residential Block(T3)
Club House Facilities at Basement and G-F Level with One Basement Carpark Floor
Two High Rise Towers, both with 31 Storeys of Residential Floors with Top Roof Floor of 105m overall height, The Floor-to- Floor Height of Typical Floors is 3.15m and total nos. of Residential Flats are 1049 nos.
One Low Rise Block with 5 Storeys of Residential Floors with Top Roof Floor of 24m overall height, The Floor-to-Floor Height of Typical Floors is 3.5m and Total nos. of Residential Flats are 10 nos.
The External Façade of the Towers are Mainly Unitize Curtain Wall Design with Aluminum Cladding & Feature Finishes.
Partly External Wall is Constructed by Precast Façade arrangement with ensure quality performance.
The Premise also include Club House, Swimming Pools, both Indoor and Outdoor, Recreation Facilities with Glass Wall Design at G-F.
There is also Waterfront Promenade Facilities constructed in front of the Premise for Lesure and Causal Use.

Development at Site A and Estate Road of Wong Chuk Hang Station Property Development, Aberdeen Inland Lot No 467
(2019-2022)
Mass Transit Railway,Road King Infrastructure Limited,Ping An Real Estate Co., Ltd
2019-2022
The building program consists of three platform levels (2/F – P/F) and one transfer level (5/F), with two 34-storey residential high-rises providing 808 residential units combined.

The ARLES
(2018-2023)
CENTRALCON INVESTMENT HOLDING COMPANY LIMITED
2018-2023

Proposed Residential Development Tseung Kwan O Area 86, Site I, Tseung Kwan O, New Territories – TKOTL 70 R.P.
(2018-2022)
City Century Development Limited
2018-2022
Dungeon 4th floor LG1 – LG4, 2-story dungeon parking lot LG1 – LG2, 1-layer large cutting board; Two super high-rise residential buildings, with 46 and 50 floors respectively, providing 893 units.

MONTARA - Composite Development at Lohas Park Package 7A&B, TKOTL70RP, Site C1
(2017 – 2021)
MTRC and Wheelock Group J.V.
2017 – 2021

Le PONT - Residential and Kindergarten Development at TMTL 541 So Kwun Wat Road Area 56, Tuen Mun
(2017 – 2020)
Vanke Real Estate (Hong Kong) Ltd.
2017 – 2020

SOLCITY - Property Development at West Rail Long Ping Station (South), Yuen Long Town Lot No. 512
(2017 – 2020)
Chinachem Group
2017 – 2020

The REGENT - Residential Development at Tai Po Town Lot No. 221, Shan Tong Road, Lai Chi Shan, New Territories
(2017-2020)
China Overseas Land & Investment Ltd.
2017-2020
PROPOSED RESIDENTIAL DEVELOPMENT AT S.T.T.L NO.605,LOK WO SHA LANE, SHA TIN,NEW TERRITORIES
(2017-2020)
CITIC Pacific Limited
2017-2020
Three 22 to 23 story upper floors and a 2-story basement (including Including clubhouse, indoor swimming pool, and duplex units on the top and bottom floors.

Composite Development at 450-456G Queens Road West, Hong Kong
(2017-2019)
Group Leader Limited
2017-2019

NAPA - Residential Development at TMTL 427, So Kwun Wat Road, Tuen Mun, N.T.
(2015-2017)
Wheelock Group
2015-2017

ONE KAI TAK - Residential Development at NKIL 6516 & 6517, Kai Tak, Kowloon
(2015-2017)
China Overseas Land & Investment Ltd.
2015-2017

The BLOOMSWAY - Residential Development at TMTL 423, Area 48, Castle Road, So Kwun Wat, Tuen Mun, N. T.
(2014-2017)
Kerry Holding Ltd.
2014-2017

MAY FAIR BY THE SEA - Residential Development at TPTL No.200 and 201, Pak Shek Kok, Tai Po, New Territories
(2013-2015)
Sino Group
2013-2015

GRAND AUSTIN - Residential Development at Austin Station, Site D, KIL N. 11129, Kowloon Contract No. D-106
(2012-2015)
Wheelock Group, New World Group and MTRC J.V.
2012-2015

THE AVENUE – Residential Development at IL9018(H15), Lee Tung Street / McGregor Street, Wanchai, Hong Kong
(2011-2015)
Sino Group, Hopewell Group and Urban Renewal Authority J.V.
2011-2015

THE GREEN – Residential Development at Fan Kam Rd DD100, Kwu Tung South, N.T.
(2010-2013)
China Overseas Land & Investment Ltd.
2010-2013

Main Contract for Superstructure Works for Proposed Composite Development at NKIL 6309, 3 Chun Yan Street, Wong Tai Sin, Kowloon<(2010-2012)
Kerry Properties Limited
2010-2012
The total construction area is 136145 square meters, including a 7-story platform and 5 31 story high-rise buildings, providing a total of 968) residential units.

FESTIVAL CITY Phase 1 at Tai Wai Maintenance Centre Phase 1
(2007-2010)
Cheung Kong Property and MTRC J.V.
2007-2010

LAKE SILVER at Ma On Shan STTL 530
(2007-2009)
Sino Group
2007-2009

TWTL 394 Yueng Uk Road Tsuen Wan
(2006-2008)
Ocean Treasure (HK) Ltd,c/o Sino Group
2006-2008

VISION CITY – Residential Development at TWT 398 Tai Ho Road/ Yeung Uk Road, Tsuen Wan
(2004-2007)
Sino Group and Urban Renewal Authority J.V.
2004-2007

MOUNT BEACON – Residential Development at N.K.I.L. 6196, Cornwall Street, Kowloon Tong
(2004-2006)
Sino Group, Chinese Estates Holdings and Manhattan Group J.V.
2004-2006

ONE SILVER SEA - Commercial and Residential Development at Hoi Fai Road KIL 11158, West Kowloon
(2003-2006)
Sino Group
2003-2006

Cyberport Residential Development at Telegraph, Hong Kong Main Contract for Phase R3 & R4a
(2003-2006)
Cyber-port Management Limited
2003-2006
Construction of eight residential towers (38-43 storeys each) atop a 7-storey podium comprising: Car park facilities, Clubhouse amenities, Total residential units: 812
Site Parameters: Site area: 45,100 m², Gross Floor Area (GFA): 181,200 m², Podium area: 54,000 m², Tower area: 127,000 m², Building height: 176m (PD*)
Ancillary Works: Perimeter fencing, Drainage systems, Landscaping works

RESIDENCE OASIS - Hang Hau Commercial & Residential Development
(2003-2005)
Sino Group, MTRC and Kerry Holding Ltd. J.V.
2003-2005

Proporsed Residential Development at KIL No.11118, King's Park, Kowloon
(2002-2004)
Grace Sign Ltd
2002-2004
Construction of eight 25-storey residential towers atop a 4-storey podium comprising: Car park facilities, Clubhouse amenities
Ancillary works including: Perimeter fencing, Landscaping, Drainage systems
Provision of 700 residential units

REGALIA BAY - Residential Development at R.B.L. 1138 Stanley Hong Kong
(2001-2004)
Paliburg Group and China Overseas Land & Investment Ltd. J.V.
2001-2004

NERINE COVE - Residential Development at Tuen Mun Town Lot No. 407, Tuen Mun, N.T.
(1998-2000)
China Overseas Land & Investment Ltd.
1998-2000

Design and construction of light public housing at Olympic avenue,Kai Tak
(2023-Work in progress)
Architectural Services Department
2023-Work in progress

Construction of Public Housing Development at Wang Chiu Road Phase 1
(2022-Work in progress)
Hong Kong Housing Authority
2022-Work in progress

Construction of Public Housing Development at Hang Tai Road, Ma On Shan Area 86B Phase 2
(2022-2025)
Hong Kong Housing Authority
2022-2025
Construction of Public Housing Development at Fanling Area 36 Phase 4 and A&A Works at Ching Ho Estate
(2021-2025)
Hong Kong Housing Authority
2021-2025

Construction of Public Housing Development at Lei Yue Mun Phase 4
(2021-2024)
Hong Kong Housing Authority
2021-2024
The project comprises two 45- and 47-storey residential towers, an 8-storey public services building, and an underground car park with an outdoor elevator. It will provide 2,021 public housing units and 91 parking spaces.

Construction of Public Housing Development at Ching Hong Road North, Tsing Yi, Phase 1 and Phase 2
(2020-2025)
Hong Kong Housing Authority
2020-2025

Construction of Public Housing Development at Tuen Mun Area 54 Sites 3 & 4(East)
(2019-2022)
Hong Kong Housing Authority
2019-2022
Construction of Public Housing Development at Tsing Hung Road, Tsing Yi
(2019-2022)
Hong Kong Housing Authority
2019-2022

Yuk Wo Court
(2016-2020)
Hong Kong Housing Authority
2016-2020
Yuk Wo Court is a single-block home ownership housing estate with 46 floors (basement and floors 1-45, including the 20th floor fire escape and sky garden), providing 830 units, of which 260 are studio, 350 are one-bedroom, and 220 are two-bedroom units.

ON TAI ESTATE Block 10 and 11 at Anderson Road Site C1 & C2 Public Rental Housing
(2014-2017)
Hong Kong Housing Authority
2014-2017

SHEUNG CHUI COURT and CHING CHUN COURT - Home Ownership Scheme Development at Sha Tsui Road, Ex-Tai Wo Hau Factory Estate, Tsuen Wan and Ching Hong Road, Cheung Ching, Tsing Yi
(2014-2017)
Hong Kong Housing Authority
2014-2017

SHUI CHUEN O ESTATE - Public Rental Housing at Sha Tin Area 52 Phases 1 to 4
(2011-2016)
Hong Kong Housing Authority
2011-2016

Public Rental Housing Development at Kai Tak Site 1A Phases 1 and 2
(2010-2013)
Hong Kong Housing Authority
2010-2013

Choi Wan Road Site 2 Phase (Non-Domestic Portion), Site 3A and District Open Space Site A
(2008-2011)
Hong Kong Housing Authority
2008-2011

HOI LAI ESTATE - North Part of West Kowloon Reclamation Site 10, Phases 1 to 4
(2002-2007)
Hong Kong Housing Authority
2002-2007

Redevelopment of Kwai Chung Estate Phase 4
(2001-2005)
Hong Kong Housing Authority
2001-2005

TIN YAN ESTATE - Tin Shui Wai Area 101 Phase 2
(2001-2004)
Hong Kong Housing Authority
2001-2004

Redevelopment of Upper Ngau Tau Kok Phase1
(2000-2002)
Hong Kong Housing Authority
2000-2002

Redevelopment of Upper Wong Tai Sin Estate Phase 1
(1998-2000)
Hong Kong Housing Authority
1998-2000

Redevelopment of Shek Yam Estate Phase 2 at Tsuen Wan
(1997-2000)
Hong Kong Housing Authority
1997-2000

TIN SHING COURT - Tin Shui Wai Area 3, Phase 4
(1997-1999)
Hong Kong Housing Authority
1997-1999

TIN CHUNG COURT - Tin Shui Wai Area 31, Phase 3
(1997-1999)
Hong Kong Housing Authority
1997-1999

Redevelopment of Hing Wah Estate - Phase I
(1996-1999)
Hong Kong Housing Authority
1996-1999

Redevelopment of Tsui Ping Estate Phases 4, 6 & 8
(1987-1996)
Hong Kong Housing Authority
1987-1996

Redevelopment of Siu Sai Wan Estate, Phase 2
(1987-1993)
Hong Kong Housing Authority
1987-1993

Redevelopment of Lei Tung Estate, Phase 1
(1984-1986)
Hong Kong Housing Authority
1984-1986

Redevelopment of Tai Wo Hau Estate. Phase 2
(1982-1984)
Hong Kong Housing Authority
1982-1984